DIYEFI.org Forum
http://forum.diyefi.org/

A-frame Design & Construction Thread
http://forum.diyefi.org/viewtopic.php?f=15&t=2558
Page 2 of 2

Author:  Fred [ Wed May 25, 2016 8:08 am ]
Post subject:  Re: A-frame Design & Construction Thread

Waterproofing worked out well today, at least: https://twitter.com/FredCookeNZ/status/ ... 5997045761

Even if it wears down with time, it should be a while before there's no oily coating left and the rust begins. It hadn't taken long for the rust to form in the hex holes full of water and out in the weather all the time attached to the caravan.

Page 2 of 2 All times are UTC [ DST ]
Powered by phpBB® Forum Software © phpBB Group
http://www.phpbb.com/